Production base
Chao'an Economic Development Zone, Chaozhou, Guangdong — 30,000 m² site, about 40 km to Shantou port, 380 km to Yantian and 420 km to Nansha.
Site overview
Rolling, finishing, inspection and warehousing on one site
The base covers about 30,000 m² with 12 lines — cold rolling, hot rolling, finishing, slitting and cutting — for roughly 2 million tonnes a year. The main bay runs in one direction: coil moves from rolling to finishing, inspection and packing without doubling back.
The site is in eastern Guangdong: about 40 km to Shantou port, 380 km to Yantian (Shenzhen) and 420 km to Nansha (Guangzhou). Road transport reaches the terminal the same day; export cargo is normally consolidated within 1–2 days.

Key figures
Site and process flow
| Item | Notes |
|---|---|
| Layout | Cold rolling, hot rolling, finishing, QC and finished-goods storage are laid out in separate zones with one-way material flow, minimising cross traffic. |
| Capacity mix | Cold rolled coil and sheet about 55%, hot rolled coil and plate about 30%, circles, slit strip and custom parts about 15%. |
| Energy and environment | Dust extraction, water treatment and waste-heat recovery are installed; emissions are held to local limits and tested by third parties on a regular basis. |
| Location and logistics | About 40 km to Shantou port, 380 km to Yantian and 420 km to Nansha — same-day delivery to the terminal by road. |
Inspection and warehousing
Every batch has a traceable inspection record
The QC centre inspects incoming material and outgoing product: chemistry, mechanical properties, dimensional tolerance, surface quality and intergranular corrosion (on request). Certificates are issued per heat number; third-party witness inspection (SGS / BV / Intertek) can be booked ahead.
Finished goods are stored apart from processing; coils upright, sheets flat, palletised with moisture barrier to export standard. Labelling, strapping and supervised loading photos on request.

FAQ
Learn more
Need a quote or technical support?
Tell us grade, size, quantity and destination port — FOB / CIF quote within 24 hours.
